Error
  • JUser: :_load: Unable to load user with ID: 391
The Project: Electrified light rail transit Total length of 34.25 km (North-South line 16.9 km and East-West line 17.35 km) Two lines (i.e. North-South and East-West lines) use common track of about 2.7km. Standard Gauge (1.435 meters) and Double track for the whole route Capacity of 80,000 PPH (Passenger/hr)
The project Length of 656 km Double track from Addis Ababa to Adama (107 km) Single track from Adama to Dewele (549 km) Both for freight and passenger transportation Connects Addis Ababa with the port of Djibouti Driven by renewable energy source (electric traction) Standard Gauge (1.435 meters) Railway Stations Sebeta, Lebu, Indode, Bishftu, Modjo, Adama, Metehara, Awash, Mieso, Mulu, Afdem, Bike, Erer, Dire Dawa, Shinle, Dewele, and Djibouti port stations are the major stations…
The project Has total length of 375 km Single track line Both for freight and passenger transportation Connects Addis Ababa with the port of Djibouti Driven by renewable energy source (electric traction) Standard Gauge (1.435 meters) Railway Stations Awash, Jebuha,Kureberet,Karakore,Kemise,Kombolcha,Hayik.Mersa and Hara Gebeya are the major stations in this project. Special Features of the Project Reduces the travel time to the Djibouti port by more than 50% Will contribute to the economic development of hinterland…
The project Has a total length of 496 km Single track of the whole route Freight transportation and mobility of passenger Driven by renewable energy source (electric traction) Standard Gauge (1.435 meters) Railway Stations Sebeta, Ambo, Ijaji, Seka, Jimm,Agaro,Toba,Dembi and, Bedele are the major stations along this corridor. Special Features of the Project Reduces the travel time to the southwest part of the country. Connects Ethiopia to the neighboring country South Sudan
Page 1 of 2