According to the SWERA study the estimation of land area suitable for grid based wind electricity generation in Ethiopia is estimated to be about 20,000 square kilometers.In terms of generation capacity; the study estimates the total national potential for grid based wind electricity system to be about 100 GW.
PROJECT LOCATIONThe Project site is located around 95km south east of Addis Ababa and around 3km north east of Adama/Nazareth on an altitude range of 1836 - 1926 m. PROJECT OBJECTIVEThe main objective of this project is to develop 51MW Wind Power with 34 Turbine units of each 1500kW capacity and supply electric power to the Ethiopian society on fast track basis to alleviate the power shortage in the country, and is necessary for the…